Review of the Assessment Report on Four Defective Large-diameter Bored Piles in the Area of Air Traffic Control Tower of the Third Runway Concourse of Airport Authority Hong Kong (Bachy Soletanche Group Limited – LT Sambo Company Limited JV, Hong Kong)
Tender support for China State Construction (Engineering) Hong Kong Limited for the alterative design for the foundations of the sewage treatment works for Contract No. YL/2020/01 "Development of Lok Ma Chau Loop Main Works Package 1 – Contract 1 Site Formation and Infrastructure Works Inside Lok Ma Chau Loop and Western Connection Road Phase 1" (Binnies Hong Kong Limited)
Independent structural design audit for Tendon Replacement Works of Shenzhen Bay Bridge - Hong Kong Section (Maurice Lee & Associates Limited, Hong Kong)
Independent structural design audits of five (5) bridges at Kwu Tung North and Fanling North (Maurice Lee & Associates Limited, Hong Kong)
Expert opinions on the evaluation of as-constructed strength of the grout for socketed steel H-piles for Terminal 2, Main Building and North Annex Building, Hong Kong International Airport, Lantau Island, N.T. - The Remaining Portion of Chek Lap Kok Lot No. 1 and the Extension Thereto (Falcon Foundation Engineering Company Limited, Hong Kong)
Expert opinions on the evaluation of as-constructed strength of the grout for socketed steel H-piles for South Annex Building, Hong Kong International Airport, Lantau Island, N.T. - The Remaining Portion of Chek Lap Kok Lot No. 1 and the Extension Thereto (Falcon Foundation Engineering Company Limited, Hong Kong)
Assessment of the existing conditions of a brick wall located at her Pokfulam Campus and making of preliminary recommendations for maintenance and stabilization works of the brick wall (Kellett School, Hong Kong)
Investigation of the loss of sonic signals at Bored Pile No. P7 for the proposed development of Wing On Life Building at 22-22A Des Voeux Road Central, Hong Kong (Sunley Engineering and Construction Co. Ltd.)
Engineering Expert in the disputes between Lot 1994 and Lot 1995 of D.D. 104 in Sheung Chuk Yuen (上竹園), Yuen Long, New Territories (Khoo & Co. LLP, Hong Kong)
Expert opinions on the unusual subsidence of the jetty of North Point Vehicular Ferry Pier (The Hongkong and Yaumati Ferry Company, Hong Kong )
Expert opinions on the sudden ground subsidence on the Pak Shek Kok Promenade cycling track in the vicinity of the construction site at T.P.T.L. No. 214, Fo Yin Road, Pak Shek Kok, Tai Po, New Territories on 1st December 2016 (New Concepts Foundation Limited, Hong Kong)
Expert opinions on the sudden ground subsidence on Hang Yip Street in the vicinity of the construction site at Kwun Tong Inland Lot No. 761 (Sunley Engineering and Construction Co. Ltd., Hong Kong)
Expert opinions on the sudden ground subsidence incident occurred at Shek Kip Mei Estate Phase 6 on 25th August 2018 (Shui On Building Contractor Ltd., Hong Kong)
Expert opinions on the design and construction of piles for the foundation of West Kowloon Law Courts Building at Sham Shui Po, Hong Kong (Shui On Building Contractor Ltd., Hong Kong)
Expert opinions on the design and construction of piles for the site formation for Kai Tak Cruise Terminal Development, Hong Kong (Penta-Ocean Construction Co. Ltd., Hong Kong)
Expert opinions on the constructability of these interlocking steel pipe pile walls for CEDD Contract No. HK/2009/01 Wan Chai Development Phase II – Central-Wan Chai Bypass at Hong Kong Convention and Exhibition Centre (Chun Wo – Leader Joint Venture, Hong Kong)
Design of Stainless Steel Pipe for Preparation of Tender Submission for WSD Contract 15WSD10 Expansion of Tai Po Water Treatment Works (Chun Wo Construction & Engineering Co., Ltd., Hong Kong)
Expert opinions on steel tubular piles supplied by Far East Metal & Hardware Co. for CEDD Contract No. HK/2009/02Wan Chai Development Phase II – Central-Wan Chai Bypass at Wan Chai East (Chun Wo – CRGL Joint Venture, Hong Kong)
Structural monitoring of Fire Boat Alexander Graham (Leisure and Cultural Services Department, Hong Kong SAR Government [jointly with Fugro Geotechnical Services])
Determination of the length of anchors underneath the Cross Harbour Tunnel to facilitate the design of the Central-Wan Chai Bypass (Highways Department, Hong Kong SAR Government [jointly with AECOM])
Expert opinions on excavation and lateral support for the redevelopment of No. 12-18, Hau Wong Road, Kowloon City, Kowloon (K.H. Foundations Limited, Hong Kong)
Expert opinions on the construction of foundations for the Public Library & Indoor Recreation Centre in Area 3, Yuen long (K.H. Foundations Limited, Hong Kong)
Expert opinions on the construction of foundations for a special school for the physically disabled in Area 16, Tuen Mun, New Territories for the Architectural Services Department (K.H. Foundations Limited, Hong Kong)
Expert opinions on the static load test results of auger piles for the construction of two primary schools at Fuk Wing Street, Shamshuipo, Kowloon for the Architectural Services Department (K.H. Foundations Limited, Hong Kong)
Agreement No. CE9/2006 - Tolo Harbour Sewerage Stage II (Investigation, Design & Construction) (Drainage Services Department, Hong Kong SAR Government [jointly with Maunsell-Metcalf & Eddy Joint Venture (now AECOM)])
Provision of Consultancy Study for Review of Increasing Leachate Generation in Restored Pillar Point Valley Landfill (PPVL) (Environmental Protection Department, Hong Kong SAR Government)
Provision of Consultancy Service for the Review of Surface Water Management Plans 2019 Adopted at WENT, NENT & SENT Landfills in Hong Kong (Environmental Protection Department, Hong Kong SAR Government)
Study on the enhancement of surface water management at SENT, NENT & WENT Landfills in Hong Kong (Environmental Protection Department, Hong Kong SAR Government)
Independent review of use of non-destructive testing in quality control in soil nailing works Civil Engineering and Development Department, Hong Kong SAR Government
Expert advice for possible cost and time improvement for the asbestos/plant removal and demolition works (decontamination works) at Lot's Road Power Station, Chelsea, London, United Kingdom (Hutchison Whampoa Properties Limited, United Kingdom)
Independent review of powderpost beetle damage at North Point Alliance Church Truth Centre, Hong Kong (Sino Rich Engineering Limited, Hong Kong)
Independent review of test results on polyethylene pipes (Lam Woo – Preussag Joint Venture, Hong Kong)
Laboratory soil testing for AOB Tower, Sholudenko Street, Shevchenkovsky Kiev, Ukraine (Maunsell Geotechnical Services Limited, Hong Kong)
Field-scale evaluation of Slotstress® technology in Hong Kong (Freyssinet Hong Kong Limited, Hong Kong)
Assessment of the potential settlement caused by vibration generated by chiseling of bedrock below Victoria Harbour, Hong Kong (Intrafor Hong Kong Limited, Hong Kong)
Engineering inspection of Slope Nos. 11SW-B/FR116(1), 11SW-B/FR284, 11SW-B/R482 & 11SW-B/R484 at Catalina Mansion, Lot No. IL 8305, 98-100 MacDonnell Road, Hong Kong (Times Geotechnical Engineering Ltd., Hong Kong)
Geotechnical assessment for the slope underneath existing platform at House No. 48, Cedar Drive, the Redhill Peninsula, Tai Tam, Hong Kong (Times Geotechnical Engineering Ltd., Hong Kong)
Renovation of Scout Rooms (Wah Yan College, Kowloon, Hong Kong)
Development of open space along Tin Shing Road, Permanent Government Land Allocation GLA-TSW 26, 28 Tin Pak Road, Tin Shui Wai, Yuen Long, New Territories (Tin Shui Wai Catholic Primary School, Hong Kong)
Design of temporary works at Phase VII Development of The Hong Kong Polytechnic University, Hunghom, Kowloon (Shui Wing Engineering Co. Ltd., Hong Kong)
Technical opinions on slope works at Kwai Chung Estate Phase 5, New Territories (Hip Hing Construction Co. Ltd., Hong Kong)
Vibration analysis of Ngau Chi Wan Fire Station, 1 Clear Water Bay Road, Kowloon (Chung & Ng Consulting Engineers Ltd., Hong Kong)
Certification of completion of slope maintenance work for Feature 7SE-A/C86(3) at Rosary Villas, 1-19 Lok Lam Road, Shatin (JB Engineering Company, Hong Kong)
Independent checking of bored pile construction procedure for the construction the Hong Kong Convention and Exhibition Centre Extension, Wan Chai, Hong Kong (Bachy Soletanche Group, Hong Kong)
Independent checking of trench stability, guide wall design and construction method of bored piles; and certification of completion of guide wall construction for Construction of Shatin Sewage Treatment Works Stage III Extension Phase I, DSD Contract No. DC/200002, Shatin, New Territories (Bachy Soletanche Group, Hong Kong)
Proposed alternative detail for the circular links of large-diameter bored piles to be constructed for the Airport Authority (CRBC-Bachy-Sambo JV, Hong Kong)
Independent evaluation of concrete cover to as-constructed diaphragm walls of the Central-Wan Chai Bypass, Hong Kong (Intrafor Bachy Soletanche Group Joint Venture, Hong Kong)
Feasibility study on the relocation of the Faculty of Law, Pokfulam, Hong Kong (Faculty of Law, The University of Hong Kong)
Technical review of losses associated with 11 bored piles at Cyberport Development at Telegraph Bay Contract R101a/R101b (Cunningham Lindsay (HK) Limited)
Review of foundation practice in Hong Kong (Real Estates Developers' Association of Hong Kong)
Third safety review of small service reservoir: Agreement No. CE 63/2000 (Water Supplies Department)
Promotion of the use of jack piling in Hong Kong (China Technical Markets Ltd.)
Engineering feasibility study for the proposed access road to the proposed residential development at Lots 667A4, 667AR.P. & 668R.P. in D.D. 179, Shatin, N.T. (to be known as STTL 498) (Fotton ELA Architects Ltd. for Fairheart Development Ltd.)
Investigation of damage after pipe jacking works at Harcourt Road (GAB Robins Hong Kong Ltd.)
Independent Checking Engineer Service for pile load tests at Shatin Sewage Treatment Works Extension Stage 1 Phase III (Bachy Soletanche Group for DSD Contract No. DC/2000/02)
Reviewing of foundation practice in Hong Kong (Sun Hung Kai Engineering Co. Ltd.)
Re-assessment of as-constructed bored pile foundations for Contract CC212: West Rail Siu Hong Station Zone N (Trevi Construction for KCRC)
Re-assessment of as-constructed bored pile foundations for Contract CC223: West Rail Tuen Mun Station Zone G (Trevi Construction for KCRC)
Alternative design of foundations for Shatin Sewage Treatment Works Extension Stage 1 Phase III (Bachy Soletanche for DSD Contract No. DC/2000/02)
Audit Assignment for Tin Shui Wai Area 31, Phase 1, Blocks 1 to 6: Agreement No. CRB/SP/2000/48 (the Hong Kong Housing Authority)
Audit Assignment for Tin Shui Wai Area 102, Phase 3, Blocks 9 & 10: Agreement No. CRB/SP/2000/49 (the Hong Kong Housing Authority)
Audit Assignment for Tin Shui Wai Area 102, Phase 5, Blocks 17 & 18: Agreement No. CRB/SP/2000/50 (the Hong Kong Housing Authority)
Revamping the Hong Kong Housing Authority Specification and process - Stage 2: Agreement No. CRB/SP/2000/63 (the Hong Kong Housing Authority)
Revamping the Hong Kong Housing Authority Specification and process - Stage 1 (the Hong Kong Housing Authority)
The Hong Kong Housing Authority Preventive Foundation Enhancement Programme (the Hong Kong Housing Authority)
Detailed design of North West New Territories Landfills and Gin Drinkers Bay Landfill Restoration: Contract No. EP/SP/30/95 (Swire SITA for EPD)
Detailed design of Tseung Kwan O Landfills Restoration: Contract No. EP/SP/29/95 (Swire SITA for EPD)
Development and teaching of "Course on Pile Foundation Construction" (the Hong Kong Housing Authority)
Analysis of geotechnical engineering data for the Lamma Power Station Extension (the Hongkong Electric Co., Ltd.)
Alternative design of pile foundations for widening of Fo Tan Road and related improvement measures in Fo Tan (Shun Yuen Construction/CNCEC JV for HyD Contract No. HY/99/02)
Assessment of rainstorm damage at Ng Tung River (C.S. Cheung & Co. Ltd. for Tai Ping Insurance Co. Ltd.)
Assessment of sub-standard minipiles at Kowloon Cricket Club (C.S. Cheung & Co. Ltd. for HIH Casualty and General Insurance Co. Ltd.)
Minipile assessment for upgrading of Shek Wu Hui Sewage Treatment Works (Freyssinet Hong Kong Limited for DSD)
Evaluation of ground settlement causing damage to seawall coping at Tsuen Wan Public Cargo working area at Stonecutters Islands (GAB Robins Hong Kong Ltd.)
Geotechnical support to the Environmental Impact Assessment including the design and supervision of the marine site investigation (contract sum HK$14.4 M) for the Lamma Power Station Extension (the Hongkong Electric Co., Ltd.)
Construction of slope stabilization works at Slope 7SE-A/C56 (KCRC Slope No. U11.6) at Fo Tan Station of Kowloon-Canton Railway (KCRC)
Geotechnical study for slopes along the KCRC East Rail including stability analyses, design of ground investigation programs and design of stabilization works (KCRC)
Critical analysis of fill compaction data of pavement formation for the New Airport at Chek Lap Kok Contract 410 (Nishimatsu-Costain-China Habour Joint Venture for Airport Authority)
Detailed design of vertical and sloping seawalls for the reclamation of Lamma Power Station Extension (the Hongkong Electric Co., Ltd.)
Development of "Training Materials on Control of Recompaction of Fill Slopes" for LPM Contract CE 16/2000 (GEO)
Restoration and strengthening of Tin Shui Wai, Area 102, Phase 3, Block 9 (the Hong Kong Housing Authority)
Evaluation of the method statement for groundwater control of the 127 m deep Chai Wan PTW drop shaft for launching chamber and tunnels for DSD Contract No. DC/96/17 Strategic Sewage Disposal Scheme Stage 1 – Principal Collection and Treatment System Completion Works for Transfer System from Chai Wan to Kwun Tong and from Tseung Kwan O to Kwun Tong (Paul Y - Seli Joint Venture for DSD)
Assessment of stability of diaphragm wall trench due to dynamic loading at Yen Chow Street Station, Sham Shui Po Section of DD400 - West Rail (Hyder Consulting Ltd. for KCRC)
Investigation of the stability of temporary excavation for landfill construction (Jack. H. Holt & Associates, Austin, Texas, U.S.A.)
Performance of mineralogical tests and evaluation of the feasibility of an alternate containment system for a hazardous waste site at Hardage, Oklahoma, U.S.A. (James K. Mitchell Geotechnical Engineer, Moraga, California, U.S.A.)
Evaluation of the viability of using electrokinetics for hazardous waste site remediation for Peer Consultants, Dayton, Ohio, U.S.A. (James K. Mitchell Geotechnical Engineer, Moraga, California, U.S.A.)
Construction supervision of Yau Kom Tau Treatment Works (output capacity 250,000 m3/day) and Service Reservoir (storage capacity 40,000 m3), and administration of the construction and plant installation contracts (Water Supplies Department, Hong Kong Government)
Planning and design of several geotechnical and water supply projects
Performance of stability analyses for slopes and excavations
Design of remedial measures for slope failures, support systems for excavations and hand-dug caissons
Laying out of the operation requirements for various structures of Yau Kom Tau Treatment Works and performance of the structural analyses and design accordingly (Water Supplies Department, Hong Kong Government)
Analysis of the correlation between the amount of cumulative rainfall and the failures of natural and man‑made slopes in Hong Kong (Geotechnical Control Office, Hong Kong Government)
Development of an early warning system for emergency evacuation (Geotechnical Control Office, Hong Kong Government)
Structural analyses of industrial buildings in Singapore
Site inspection of structures under construction in Singapore